Client
ForHealth
ForHealth’s Torquay Urgent Care Clinic needed to be ready for patients on a fixed opening date, with specialist clinical rooms, live neighbouring businesses and a construction program running through a difficult holiday period.
Decocorp set the job up early, confirming key trades and ordering critical materials before site pressure could affect the program. Radiation requirements for the procedure and X ray room were addressed from the outset, including lead lined materials, so the clinical fitout could keep moving. The finished clinic includes reception and waiting areas, an isolation room, administration and nurses spaces, a GP treatment bay, staff amenities, kitchen, sterile storage and a procedure room with X ray capability. The site called for careful daily control. Work took place beside active car parks, neighbouring tenants and customer traffic, while base building items were coordinated alongside the fitout. Decocorp kept the program moving by drawing on its Melbourne trade network and adjusting sequencing as conditions changed. The clinic was ready in time for opening and was the fastest urgent care facility delivered nationally. A sharp result built on planning, reliable trades and close control of the details that matter in healthcare.
ForHealth
Design and Refurbishment
4 weeks
Medical
260M2
Torquay, VIC
If you have a project that you would like to discuss, drop us a line. We would love to hear about your vision and consider how we can make it a reality.
get in touch